|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,860 Points: 17,732 Location: ipswich
|
STAGE 99:
Left Window net.
Pic 1: Carefully fit the net rods 99C and 99D to the net 99B as shown.
Pic 2: Fit the long rod 99D on the net into the locations on the interior as shown. Make sure the net is the correct way round.
Pic 3: Fit the shorter hooked rod 99C in place where indicated.
Pic 4: Fit the roll cage bar 99A in place as indicated. Highlighted in yellow. You will find it easier to temporarily remove the black interior vent hose to do this.
Pic 5: This shows the location of the front of the bar. Highlighted in yellow.
Pic 6: Fix from underneath with 2 x AP screws.
Pic 7: Replace the air vent hose.
Store safely for now.roymattblack attached the following image(s):
|
|
|
|
Guest
|
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.