|
 Rank: Semi-Pro Level 1  Groups: Registered
Joined: 17/04/2010 Posts: 53 Points: 132 Location: Bradford
|
Hi, Sorry for the daft question, but what does a part consist of? The advert talks of 25 monthly parts. But the Official Build is already on parts 1-8 and is no where near a third of the way through building a zero. Is it like the Victory where you get a part a week for 25 months - about 110 parts in all? Cheers Stuntie.
Building: R2D2 and Sovereign of the Seas Subscribed: Bounty
|
|
 Rank: Master    Groups: Registered
Joined: 15/04/2010 Posts: 1,266 Points: 3,841 Location: The Quantock Hills,Somerset
|
25 monthly parts is basically 4 weeks delivered in one batch...25 monthly parts = 100 weekly parts,basic difference is the absence of a magazine. Rob Nolli Illigitimi Carborundum!!!Current Builds: HMS Victory, SV Thermopylae
|
|
 Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
The official build relates to individual parts sets per delivery in the sequence that they are assembled, i.e. parts sets 1-4 are in the first delivery, 4-8 are in the second delivery etc etc., a total of 25 deliveries = 100 individual parts sets.
|
|
 Rank: Semi-Pro Level 1  Groups: Registered
Joined: 17/04/2010 Posts: 53 Points: 132 Location: Bradford
|
Cheers for clearing that up. Will definately be subscribing to it. Cheers Stuntie.
Building: R2D2 and Sovereign of the Seas Subscribed: Bounty
|
|
Guest
|
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.