Stage 36 - Contains elevator & bow hangar parts and an 11m boat kit.
Start by marking the 80x10mm strip as shown to make the internal partitions of the bow hangar base, then glue the sections into position at the marked points upon the hangar base, making sure they are all set at 90 degrees upright.
Glue the hangar top in place and when the glue has dried, sand the end of the partitions flush with the hangar top/bottom.
Now add the thin ply to its front, gently curving it to follow the profile shape. When the glue has dried cut the excess ply so that it aligns with the ends, then sand the edges flush with the hangar top/bottom.
Place the elevator floor with the slot facing away from you, then glue the front and rear section in place, and then both sides.
Cut the 3mm and 4mm strip into 60mm long lengths, glue 4mm strip to the outer marked strips, followed by the 3mm trip inwards, repeat on the opposite elevator side. Then sand the ends of the strips flush with the top.
Remove the forward deck from the hull, then take the two hull supports and glue them into place in front of frame 13. The tops of the supports need to be flush with the central part of the frame.
The steps say to now prime the assembly from this stage, however it is better to first test-fit the elevator into position within the bow deck to check its fit, then move onto the priming of the elevator, hangar section and plate afterwards.
Finally construct and finish the 11m boat kit as before.
That's it for this week
(Completion of Stages 31 - 34 to follow)
Future stages:Stage 37 - Contains a platform & rangefinder castings and hangar parts.
Stage 38 - Contains ply hangar plates x7, metal hanger plates x2, 4x 25mm gun base and gun barrels.
Stage 39 - Contains hangar plates x10, hangar bars x5, wood strips, hangar floor, platform & rangefinder castings.
Tomick attached the following image(s):