|
|
Excellent work Trev, you've shown a great deal of patience to get the rail to look just right. Very well done and keep up the good work.... Regards Alan
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 4,761 Points: 14,429 Location: ipswich
|
I'm genuinely enjoying your updates on this build. It's great to see something a bit different in the 'vehicles' area. Keep it coming. I'm looking forward to the next part.
Roy.
|
|
 Rank: Super-Elite        Groups: Registered
Joined: 31/05/2010 Posts: 5,679 Points: 17,011 Location: Wiltshire
|
Very neat work soldering those rails together Trev. Its coming together really nicely. Tony Happy Modelling
BUILDING: Hachette Spitfire Mk 1A, Constructo Mayflower SUBSCRIPTION COMPLETE (Awaiting building): USS Constitution, Sovereign of the Seas, 1:200 Bismarck (Hachette) COMPLETED: Porsche 911, E-Type Jaguar, Lam Countach
|
|
 Rank: Elite      Groups: Registered
Joined: 13/02/2011 Posts: 2,239 Points: 6,837 Location: East Sussex
|
Hi Derek, Thank you for the tip about the wire straightener look's a handy tool to have in the rack, this will be on my next list. as I will be doing more soldering on the Coach roof. Thanks again Regards Trev Work in progress: Tombstone (Scratch) - San Francisco 2. -The Mayflower ( scratch by plan).
OcCre- Santa-Maria (Kit).
|
|
 Rank: Elite      Groups: Registered
Joined: 13/02/2011 Posts: 2,239 Points: 6,837 Location: East Sussex
|
Hi, Alan thank you for looking and for your comments, next step will be completing the Winch box and attaching the brass handrails, making a leather side bag, making a front door with a brass handle Regards Trev. Work in progress: Tombstone (Scratch) - San Francisco 2. -The Mayflower ( scratch by plan).
OcCre- Santa-Maria (Kit).
|
|
 Rank: Elite      Groups: Registered
Joined: 13/02/2011 Posts: 2,239 Points: 6,837 Location: East Sussex
|
Hi Roy thank you for looking at my Coach build, it is a change for me as I normally build large aircraft, at present I am building a 62' wing span Nijhuis Hawker-Hurricane that's a big challenge. Regards Trev Work in progress: Tombstone (Scratch) - San Francisco 2. -The Mayflower ( scratch by plan).
OcCre- Santa-Maria (Kit).
|
|
 Rank: Elite      Groups: Registered
Joined: 13/02/2011 Posts: 2,239 Points: 6,837 Location: East Sussex
|
Hi Tony, I do like a bit of soldering and this has helped me start up again as I have the top roof rails to solder looking forward to that. Regards Trev. Work in progress: Tombstone (Scratch) - San Francisco 2. -The Mayflower ( scratch by plan).
OcCre- Santa-Maria (Kit).
|
|
 Rank: Elite      Groups: Registered
Joined: 13/02/2011 Posts: 2,239 Points: 6,837 Location: East Sussex
|
UPDATE: MAKING SADDLE BAGS FOR THE WINCH. Soldering frame / Cutting leather to fit. First was to make a jig exactly the shape of the saddle bag then with the 1mm brass bend it around the jig to the exact shape keeping it as close to the jig as you bend it watching out for kinks as you go.After soldering I had to reinforce the top as this was a week spot.
 Next to cut the leather, this I had to glue a piece of leather to the brass frame to form a back side then stretch it over the jig to form the front shape, this I used spray starch to help keep the shape then leave it over night to dry.     Next to make the bag flap / buckles / and straps. Regards Trev. Work in progress: Tombstone (Scratch) - San Francisco 2. -The Mayflower ( scratch by plan).
OcCre- Santa-Maria (Kit).
|
|
 Rank: Super-Elite        Groups: Registered
Joined: 31/05/2010 Posts: 5,679 Points: 17,011 Location: Wiltshire
|
Very neat work Trev. The jig idea for making those saddle bags consistant is a very good idea. Hope it al continues well. Tony Happy Modelling
BUILDING: Hachette Spitfire Mk 1A, Constructo Mayflower SUBSCRIPTION COMPLETE (Awaiting building): USS Constitution, Sovereign of the Seas, 1:200 Bismarck (Hachette) COMPLETED: Porsche 911, E-Type Jaguar, Lam Countach
|
|
|
Looks great Trev, beautifully done.... Regards Alan
|
|
 Rank: Super-Elite        Groups: Registered
Joined: 20/10/2016 Posts: 4,504 Points: 13,548 Location: Wiltshire
|
Just caught up with this Trev. Looking really good! Lovely work! Regards, Phil W. Completed projects: 1/43 scale Bedford HA van / 1/43 scale MG TD sports car Current projects: 1/48 scale U-boat [U230] Future projects: 1/148 scale railway diorama / 1/50 scale R/C Volvo F89 logging truck / 1/148 scale Thunderbirds Fireflash
|
|
 Rank: Elite      Groups: Registered
Joined: 13/02/2011 Posts: 2,239 Points: 6,837 Location: East Sussex
|
Hi Tony thank you for looking,I am sure my jig will work time will tell,the main point was to build up the sides. Regards Trev Work in progress: Tombstone (Scratch) - San Francisco 2. -The Mayflower ( scratch by plan).
OcCre- Santa-Maria (Kit).
|
|
 Rank: Elite      Groups: Registered
Joined: 13/02/2011 Posts: 2,239 Points: 6,837 Location: East Sussex
|
Thank you Alan for your comments Regards Trev Work in progress: Tombstone (Scratch) - San Francisco 2. -The Mayflower ( scratch by plan).
OcCre- Santa-Maria (Kit).
|
|
 Rank: Elite      Groups: Registered
Joined: 13/02/2011 Posts: 2,239 Points: 6,837 Location: East Sussex
|
Hi Phil thanks for turning all those pages,working on the bag flap today will post soon Regards Trev Work in progress: Tombstone (Scratch) - San Francisco 2. -The Mayflower ( scratch by plan).
OcCre- Santa-Maria (Kit).
|
|
 Rank: Super-Elite        Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds Joined: 09/11/2012 Posts: 8,495 Points: 24,576 Location: East midlands
|
Clever work on the saddlebag jig. Well done. Looking forward to the next update. Regards delboy271155 (Derek) COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"
|
|
 Rank: Elite      Groups: Registered
Joined: 13/02/2011 Posts: 2,239 Points: 6,837 Location: East Sussex
|
Hi Derek, thanks for your comments just thought you would like to see how far I have moved with the saddlebag, I was hopeful to have made more progress today but maybe towards the end of the week.  Regards Trev. Work in progress: Tombstone (Scratch) - San Francisco 2. -The Mayflower ( scratch by plan).
OcCre- Santa-Maria (Kit).
|
|
 Rank: Elite      Groups: Registered
Joined: 13/02/2011 Posts: 2,239 Points: 6,837 Location: East Sussex
|
UPDATE:SADDLEBAGS. Materials Leather,brass rod,black cord. 1 First was to bend the shape around the saddlebag jig,this will form the base shape to hold the leather.  2 This shows the front part of the saddlebag stitched to the rear frame (this is were the brass rod is,also shows brass rod buckles in the making plus bag straps.  3 This shows one completed bag with straps and buckles,and one with the flap over to be assembled.  4 Two saddlebags now completed and ready to fit to the Winch box at the rear.  5 This is were the saddlebags fit each side of the Winch box,the only part (not supplied) are two shotguns which I will scratch.  More Soon Regards Trev. Work in progress: Tombstone (Scratch) - San Francisco 2. -The Mayflower ( scratch by plan).
OcCre- Santa-Maria (Kit).
|
|
|
Love the saddlebags Trev, looking very authentic....  .. Excellent work once again..... Regards Alan
|
|
 Rank: Elite      Groups: Registered
Joined: 13/02/2011 Posts: 2,239 Points: 6,837 Location: East Sussex
|
Hi Alan, thank you for your post back to me, I have enjoyed making the saddlebags although it has been tricky at times and taken a considerable amount of time but well worth it. Regards Trev. Work in progress: Tombstone (Scratch) - San Francisco 2. -The Mayflower ( scratch by plan).
OcCre- Santa-Maria (Kit).
|
|
 Rank: Super-Elite        Groups: Registered
Joined: 31/05/2010 Posts: 5,679 Points: 17,011 Location: Wiltshire
|
Very neatly done Trev and effort has paid off with a nice looking set of saddle bags. Tony Happy Modelling
BUILDING: Hachette Spitfire Mk 1A, Constructo Mayflower SUBSCRIPTION COMPLETE (Awaiting building): USS Constitution, Sovereign of the Seas, 1:200 Bismarck (Hachette) COMPLETED: Porsche 911, E-Type Jaguar, Lam Countach
|
|
Guest
|