|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Thanks for the comments mr T, Tony and Steve they are most welcome.She will look good cleaned up and on her display base Al
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Pack 19 has arrived just a few pics of my progress. The front of the tender detail. Tender truck parts ready for the wheels next month. Al Spal attached the following image(s):
|
|
|
nicely done Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Thanks Andy Al
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Next pack has arrived Bogies go together well and have some nice details. Tender is getting quite heavy as well. Will need a good clean up at the end of the build. Not too much left to do now Al Spal attached the following image(s):
|
|
Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
Nice to see meat being added to the bones, looks
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
|
|
|
Looking Good. Wait till you see the base “Whenever you find yourself on the side of the majority, it is time to pause and reflect.” -Mark Twain
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Thanks Jase,can't wait to start building the base but shmbo may not be too happy when she sees the size of it Is there a going to be a cover for the base offered? Al
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Pack 21 parts. Everything went together as per the instructions The tender is almost complete. Then the base ends assembled, its going to be a substantial weight once the base is completed. Only 4 packs left but still lots to do. Al Spal attached the following image(s):
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Pack 22 Packs larger than normal and a lot to do. A simple bolt together of the sides making sure the cut out is in the correct place. A view of the base frame assembled. The base top plates,i had a few marks on mine but these should be covered by future parts. Parts fitted, its certainly a substantial display base. The speaker unit parts. The speaker parts fitted into the base. Battery box and control panel switch assembly. A closer look at the control panel, the switches work well. A view from underneath showing the battery box and control panel, note the cutaway behind the battery box. Al Spal attached the following image(s):
|
|
Rank: Super-Elite Groups: Registered
Joined: 17/12/2013 Posts: 3,982 Points: 11,974 Location: NY, USA
|
Looking really nice Al. Your tender build looks very clean to me.
Carl
|
|
Rank: Vice-Master Groups: Registered
Joined: 13/02/2012 Posts: 651 Points: 1,903 Location: croydon
|
Hi AL . Your build looks fantastic and very clean. Great job. Best regards. Mark
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Thanks Carl /Mark for the comments, this is my first brass build so has been a bit of a learning experience Al
|
|
|
Nicely done Al Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Pack 23, not many left to go The parts The sound unit A straightforward fit and connection. The sleepers and ballast. first i dry fitted everything The rolling road parts. The rails All fitted and secured. Al Spal attached the following image(s):
|
|
|
The base looks great with everything added and the case when it goes on sale will look the bizz on it Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Thanks Andy, definitely need the case to keep the dust off it Al
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
The penultimate pack. The ash box fitted. The motor parts. The motor fitted and working The gearbox parts. Gearbox fitted and tested. Brake parts. Brake parts fitted Al Spal attached the following image(s):
|
|
Guest (2)
|