|
|
Welcome to the forum Doug, hope you have an enjoyable time with us and good luck with your build.... Regards Alan
|
|
Rank: Semi-Pro Level 2 Groups: Registered
Joined: 04/09/2015 Posts: 92 Points: 256 Location: Atlantis
|
Welcome aboard Doug. Your goals are very solid and you are surrounding by some amazing talent and resources to insure a successful build. (And don't be afraid to screw up!)
|
|
Rank: Beginner Level 1 Groups: Registered
Joined: 20/04/2017 Posts: 8 Points: 24 Location: Vancouver, WA USA
|
I've been quietly waiting for my Month 2 to begin some of the interior work...and they did finally arrive. Months 3-6 gave me about half of the lower frame to assemble...which was great. I did encounter a small issue with the inner/outer ribs. I found that the thickness varied, resulting in a lot of plan when the inner and outer ribs were joined by the connector and 4 screws. I found a simple solution, shown in the following pictures. First 2 pics show the amount of play the ribs moved...even tightened as much as possible. The third pic show the tips wrapped 1 and half times with adhesive backed metal tape used for heating ducts. The fourth shows the ribs back in the coupling with the screws reinserted. And finally the straighter ribs with no play. It definitely helped the sturdiness of the frame assembly. DougRGould2017 attached the following image(s):
|
|
Guest (2)
|
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.