|
Rank: Master Groups: Registered
Joined: 19/05/2015 Posts: 1,419 Points: 4,272 Location: Darmstadt, Germany
|
And only 7 months later I'm already almost done with the planking. Yeah, had a bit of a break there. The entirety of the last 4 issues was spent on planking, now there's just the two big gaps to close up and the bit at the bow.
|
|
Rank: Superelite Groups: Registered
Joined: 10/05/2010 Posts: 2,608 Points: 7,519 Location: Lincolnshire
|
Sweet lines on your build Grey . I’d never heard the name before....so I googled it! Interesting ship, and I’m sure it will be an interesting build. Keep it coming Regards Gray
|
|
Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
Taking shape nicely and has nice lines
|
|
Rank: Elite Groups: Registered
Joined: 20/04/2012 Posts: 1,787 Points: 5,292 Location: Thurso
|
Very nice job with the planking, looking great.
Graeme
|
|
Rank: Super-Elite Groups: New Members, Unapproved Joined: 11/11/2009 Posts: 3,432 Points: 10,280 Location: Colwyn bay
|
Looks great. Lovely looking ship.
Chris On the bench 1/350 Revell Tirpitz Platinum Edition (Pontos PE and Wooden deck) plus extra Eduard PE set and extra MK1 door sets.
|
|
Rank: Vice-Master Groups: Registered
Joined: 26/05/2014 Posts: 912 Points: 2,773 Location: East Sussex UK
|
Looks like a lovely shape to the hull, looking good. Regards Paul Building: DelPrado HMS Victory. Building: DeAgostini Sovereign Of The Seas.
|
|
Rank: Master Groups: Registered
Joined: 19/05/2015 Posts: 1,419 Points: 4,272 Location: Darmstadt, Germany
|
Thanks everyone In issues 25-28 we finish up the first planking, sand the hull to shape and start with second planking. We also fit the ends of the upper decks with some covering strips. The dinghys get a touch of colour.
|
|
Rank: Master Groups: Registered
Joined: 19/05/2015 Posts: 1,419 Points: 4,272 Location: Darmstadt, Germany
|
In issues 29-32 we mostly time with the second planking covering the keel section as well as the upper parts of the hull We also get to paint the name plaques and start installing handrails on deck.
|
|
Rank: Master Groups: Registered
Joined: 19/05/2015 Posts: 1,419 Points: 4,272 Location: Darmstadt, Germany
|
Up to issue 36 now. Since the last time we saw her we've finished the second planking for the most part. Also the inner sides of the bulwarks were kitted out.
|
|
|
Looking good and nice work. The hull has a nice shape to her as well Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .
|
|
|
Lovely work, looking the biz..... Regards Alan
|
|
Rank: Super-Elite Groups: Registered
Joined: 16/08/2010 Posts: 2,771 Points: 8,344 Location: Brighton
|
Grand job so far, looks awesome. Current builds.Hachettes build the bismark,HMS Victory, HMS Hood. Finished Builds Corel HMS Victory cross section.
|
|
Rank: Administration Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds Joined: 09/11/2012 Posts: 8,301 Points: 23,991 Location: East midlands
|
I`ve seen a couple of completed builds of this ship and it looks FAB. I look forward to the rest of your build and will be following with interest. Keep up the good work. Regards delboy271155 (Derek) COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"
|
|
Guest
|