|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
10/07/2017 today I successfully blew out the sawdust from the inside with high pressure air in the workshop of my workplace... well there was lots of it... 😆😆😆 Back at home I finished the slot for the keel and two sections of the keel fitted at the bow and at stern. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
11/07/2017 very little progress today, remaining parts of the keel fitted. Now it need to dry completely before the next step. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
12/07/2017 keel dried nicely, trimmed and sanded. Started to work on gallery, filled to strengten it, slots cut for gallery deck, which is also prepared to fit. Now waiting for the filler to dry completely, able to sand it flush. Continue tomorrow... gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
13/07/2017 building stand lined with some soft cloth to protect the hull being scratched. Lower and upper gallery decks fitted together with the gallery rear wall. Strings and tapes applied to keep tension on the glued edges/surfaces. Need to dry overnight. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
14/07/2017 gallery decks and rear wall dried nicely. Two layers of planks fitted to extend the gallery support. Further 1-1.5 layer will be required to reach the gallery rear wall. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
15/07/2017 further planks fitted to the gallery support. Right hand side wall of the gallery fitted and tightened, now left it dry for 1-2 hours before do the same on the left side. ... left gallery wall fitted, bow deck shaped to accomodate the further bowsprit and glued in place... now couple of hours pause again to let them dry. ... gallery side walls nicely dried, bow deck also dried and sanded to flush with the hull. Gallery top decorating planks shaped and fitted in place. started to fit the wales... firts row of the middle wales fitted from bow to half way to the length... continue tomorrow... gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
16/07/2017 first row of middle wale completed, second row started. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
18/07/2017 middle wale completed, first row of lower wale fitted. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
19/07/2017 another day, another row of plank. Well... two rows actually... Lower wale extended with two further rows. One more layer to go for the lower wale. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
20/07/2017 third row of the lower wale completed all around, covering moulding added to stern underneath the gallery. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
22/07/2017 good progress today... bow deck planked, cut out for bowsprit formed. Also upper wale fitted, lower and middle wales sanded smooth gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Elite Groups: Registered
Joined: 22/03/2010 Posts: 2,065 Points: 6,295 Location: Gorleston-on-sea
|
It is great to see that you have started a build diary on Model Space Laszlo...From what I have seen today on facebook she is looking really great. I started my HMS Victory way back in 2005 too and being half built, it had to take a back seat while I took on the sovereign of the seas..lol. Keep the pictures coming Laszlo... Current Builds: Deagostini HMS Victory: Deagostini HMS Sovereign of the seas. Completed Builds: Del Prado: HMAS Bounty: Hachette: RMS Titanic: Del Prado: Cutty Sark...
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
23/07/2017 moulding strip fitted on both sides. Started to cut out the wales where they cover the gun ports. Upper and middle wales cut on the right side. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Administration Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds Joined: 09/11/2012 Posts: 8,283 Points: 23,937 Location: East midlands
|
That`s looking good. Congrats on your "Blue" medal for getting your diary started. Regards delboy271155 (Derek) COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
20/08/2017 carrying on after a 3 weeks holiday... completed to cut out the wales at the front of gun ports on the right side... same thing started on the left side, upper and middle wales complete, only lower wale left to cut out. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
21/08/2017 finished to cut the wales at the gun ports. Holes drilled above lower and middle row gun ports to accomodate the operating ropes for gun port hatches. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
22/08/2017 precision job today hence little progress... location of wriggles marked where the wales need to cut out to accomodate them... 4 locations cut out already on the upper gun deck... gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
23/08/2017 finished to cut the wales out for the wriggles above the lower gun ports... started to work on the stem reinforcement. Need to leave it dry to allow sanding flush before do next step. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
24/08/2017 stem reinforcement fitted with further three planks, upper dolphins shaped and glued in place. gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Rank: Pro Groups: Registered
Joined: 30/11/2017 Posts: 493 Points: 1,482 Location: South Norfolk
|
26/08/2017 Lower dolphins, hawsehole reinforcements and upper stem trims are shaped and fitted, hawseholes also drilled. Decorative molding added to stem trim, deck support beams fitted to get ready to planking the upper gun deck gingerale75 attached the following image(s): Happy building! Laszlo Finished builds: HMS Victory, HMS Victory Cross-Section
|
|
Guest (9)
|