|
Rank: Master Groups: Registered
Joined: 20/09/2011 Posts: 1,312 Points: 4,126 Location: Austria
|
Impressive build!Greetings, Walter
Present builds: Revell B-24D Liberator 1:48
On the shelf: Italeri "Fiat Mefistofele", Italeri "Moto Guzzi California", Fokker "Red Baron", Revell Bismarck, Revell Tirpitz, Arab Dow, Stage Coach, .....
Completed builds: McLaren MP4/4, D-51 Steam Locomotive, HMS Victory, GWH F-15D Eagle, St. Stephen`s Cathedral (cardboard), Solar-powered paddle Steamer (little project with my son), HMS Victory X-section, "Geli" Phantom II (cardboard)
|
|
Rank: Elite Groups: Registered
Joined: 20/04/2012 Posts: 1,787 Points: 5,292 Location: Thurso
|
Thanks for looking in guys and for the positive comments.
You are right Alan she is a very nice little kit, a few minor challenges along the way but you get that with any build. I am enjoying the build and now it's down to the masts and rigging.
Graeme
|
|
|
pemberg wrote:Thanks for looking in guys and for the positive comments.
You are right Alan she is a very nice little kit, a few minor challenges along the way but you get that with any build. I am enjoying the build and now it's down to the masts and rigging.
Graeme True Graeme, every build has its challenges that need to be overcome.... My next challenge is trying to bend a 4x8mm limewood strip to fit the profile of the handrail at the bow, may have to resort to more trapezoid type cutting.... ... Interesting times ahead I think, good luck with the masts and rigging.... Regards Alan
|
|
Rank: Super-Elite Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Just caught up on your progress with this nice looking kit its looking great and has some lovely looking details, keep up the good work Al
|
|
Rank: Elite Groups: Registered
Joined: 20/04/2012 Posts: 1,787 Points: 5,292 Location: Thurso
|
Hi all, now we start on the rigging. The first job is to rig the metal chain under the bowsprit. First two blocks are fitted with wire, Pic 1, which provides an eye to hook onto the eyelet under the front of the bowsprit for one block and the other to tie to an appropriate link on the chain. The two blocks are connected with a loop of rigging thread. I first pull the threads through a block of beeswax. This flattens out all the thread hairs, makes it easier to thread through blocks and reduces the risk of the threads expanding and contracting due to moisture absorption/drying out due to changes in humidity. A length of thread was cut and threaded first through one block (leaving a ‘tail’) then the second and then back through the first (using a needle threader to get it back through the same hole) , Pic 2 & 3. The tails were left loose at this point and the wire eye on one block hooked over the eyelet under the bowsprit (after first opening up the eyelet slightly). The chain was then held straight under the bowsprit and a suitable link chosen to tie the second block to. Once the block was tied the two thread tails on the forward block were pulled almost tight to tension the chain and then a drop of super glue applied to each tail close to the block. The tails were then pulled tight and held until the super glue held, Pic 4. Once the glue was dry all excess thread was cut off. The next two ropes added were, for the want of a better description, the bowsprit stays. These were rigged in a similar way to the chain but with the stay rope being tied around one of the blocks – I find holding the block in a pair of self-closing tweezers, Pic 5, makes tying the block easier. This block was then rigged to a wired block using the same method as above. The other end of the stay was then lashed to the bowsprit eyelet and the two blocks tightened and glued as before, Pics 6, 7 & 8. Pics 9, 10 & 11 show the stays after all the excess threads have been removed. That’s it for now, the next job is to glue the companion ways/cabins to the deck then start on the masts. Graeme pemberg attached the following image(s):
|
|
|
Looks fab Graeme, very nice progress being made.... Regards Alan
|
|
Rank: Super-Elite Groups: New Members, Unapproved Joined: 11/11/2009 Posts: 3,432 Points: 10,280 Location: Colwyn bay
|
Great work Graeme, Looks fab. Chris On the bench 1/350 Revell Tirpitz Platinum Edition (Pontos PE and Wooden deck) plus extra Eduard PE set and extra MK1 door sets.
|
|
Rank: Super-Elite Groups: Registered
Joined: 31/05/2010 Posts: 5,679 Points: 17,011 Location: Wiltshire
|
Fantastic work Graeme Like the idea of using the needle threader on some of those narrow rope parts. Happy Modelling
BUILDING: Hachette Spitfire Mk 1A, Constructo Mayflower SUBSCRIPTION COMPLETE (Awaiting building): USS Constitution, Sovereign of the Seas, 1:200 Bismarck (Hachette) COMPLETED: Porsche 911, E-Type Jaguar, Lam Countach
|
|
Rank: Master Groups: Registered
Joined: 29/03/2011 Posts: 1,053 Points: 3,165 Location: Glenvista JHB
|
Hi Greame, Nice update. It's really an impressive build. Kind regards, Garth "Measure twice, cut once!!!" Finished!!! HMS Victory, Current build: Black Pearl. On hold: Bismarck, Golden Hind, Flying Scotsman, Victory Cross Section, SOTS, Tiger 1. Wish list: USS Constitution.
|
|
|
Fab work like what your doing with the blocks interesting to watch it come together Jase “Whenever you find yourself on the side of the majority, it is time to pause and reflect.” -Mark Twain
|
|
Rank: Elite Groups: Registered
Joined: 20/04/2012 Posts: 1,787 Points: 5,292 Location: Thurso
|
Thanks for looking in guys and for the positive comments, much appreciated.
Graeme
|
|
Rank: Elite Groups: Registered
Joined: 20/04/2012 Posts: 1,787 Points: 5,292 Location: Thurso
|
The first thing to do this time was to glue the companion way/cabins to the deck, Pic 1. Next was to start on the masts. These were once again tapered on the lathe, the fore mast having a stepped tip, Pics 2 & 3. Pic 4 shows the brass parts to be used as the brackets holding the upper main mast flag staff to the top of the mast. These were formed by first bending around the appropriate point on the flag staff then around the main mast, Pic 5. A re-enforcing band was then added to the lower part of each mast. These were made from 0.5x3mm wood strip. For each band a short length was cut off and soaked in water. It was then bent round an exacto knife handle – you could use the mast or an off cut of dowel, Pic 6. The position of the band was marked on the mast and a drop of thick super glue was placed where the band was to start and the end of the band glued to the mast, Pic 7. The glued end of the band was sanded to a chamfer, thick super glue added to both mast and the chamfered end and the band carefully wrapped around the mast and overlapped the band start. It was then clamped in place for the glue to dry, pic 8. Once dry the excess strip was cut off and the end again chamfered, Pic 9. The masts and flag staff were then stained. Once dry, the masts at each side of the bands were masked off and the bands painted black. The rings for the base of the masts were also painted black at this time, Pic 10. Once dry the masking tape was removed and two cleats attached to the fore mast below the band and 3 eyelets added to the top of the mast, pics 11 & 12. Eight rings, for holding the sails, were slipped down each mast. The positions of the flag staff brackets were marked on the main mast with masking tape, Pic 13 and the brackets and flag staff fitted in place using thick super glue , Pic 14. The masts base rings were then slipped over the bottom of the masts and the masts fitted into place in the hull. The base rings were then glued to the deck. Pic 15 shows the Swift at this point in the build. Graeme pemberg attached the following image(s):
|
|
Rank: Super-Elite Groups: Registered
Joined: 28/07/2014 Posts: 4,269 Points: 12,713 Location: Scotland
|
Graeme really top work love how clean everything looks its a stunner mate regards Phil COMING SOON =1/72 Italeri diorama`s Battle for the Reichstag and Stalingrad battle at the tractor factory 1/16 Trumpeter King Tiger with loads of extras ON THE GO= refurbishment of 1/25 Tamiya tiger 1 , amt Star trek kits and space 1999 models
So Much to Build,But What a Hobby!
|
|
|
Excellent work Graeme, looking the biz.... Regards Alan
|
|
|
Looking good and very nice work Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .
|
|
Rank: Master Groups: Registered
Joined: 20/09/2011 Posts: 1,312 Points: 4,126 Location: Austria
|
Another great update!Greetings, Walter
Present builds: Revell B-24D Liberator 1:48
On the shelf: Italeri "Fiat Mefistofele", Italeri "Moto Guzzi California", Fokker "Red Baron", Revell Bismarck, Revell Tirpitz, Arab Dow, Stage Coach, .....
Completed builds: McLaren MP4/4, D-51 Steam Locomotive, HMS Victory, GWH F-15D Eagle, St. Stephen`s Cathedral (cardboard), Solar-powered paddle Steamer (little project with my son), HMS Victory X-section, "Geli" Phantom II (cardboard)
|
|
|
Great work Graeme, stunning work. Mark
|
|
Rank: Super-Elite Groups: Registered
Joined: 16/08/2010 Posts: 2,771 Points: 8,344 Location: Brighton
|
Hi Graeme Looking fantastic. liked the use of the needle threder earlier for the blocks Ian Current builds.Hachettes build the bismark,HMS Victory, HMS Hood. Finished Builds Corel HMS Victory cross section.
|
|
Rank: Super-Elite Groups: Registered
Joined: 20/10/2016 Posts: 4,504 Points: 13,548 Location: Wiltshire
|
Excellent build Graeme! Regards, Phil W. Completed projects: 1/43 scale Bedford HA van / 1/43 scale MG TD sports car Current projects: 1/48 scale U-boat [U230] Future projects: 1/148 scale railway diorama / 1/50 scale R/C Volvo F89 logging truck / 1/148 scale Thunderbirds Fireflash
|
|
|
masts look great now they are in looks cool jase “Whenever you find yourself on the side of the majority, it is time to pause and reflect.” -Mark Twain
|
|
Guest
|