Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
Stage 29

Your parts:- Equaliser inner and outer, springs, brackets, nuts ,bolts and screws.

Attach two hanging brackets to each leaf spring and secure them in place using four nuts , then take an inner and outer equaliser fix it to the leaf spring using two 2 x 8mm screws. Do the same for the other leaf spring so you have a pair.

Next take the leaf spring assemblys and place them over the side frame then fix both in place using two 2 x 10mm screws.

Stage complete.
arpurchase attached the following image(s):
PA290031.JPG
PA290034.JPG
PA290039.JPG
PA290042.JPG
PA290047.JPG
PA290049.JPG
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

arpurchase
#2 Posted : 29 October 2016 20:28:07

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
Stage 30

Your parts:- Wheels 'A' and 'B'

You will also need the parts left over from Stage 28 for this stage.

Line up the brass bushes with the leading truck chassis making sure the bushes are correctly placed and that the spoked wheel is placed at the rear.

Next take one of the long stays and place it over wheels and line it up with the four holes in the chassis and fix it in place using 2 x 4mm screws. Do the same for the other stay.

Now take the wheel assembly and turn it over so you can see the forward truck support and place one of the washers over the hole in its centre. Next line up the forward truck assembly with the hole and then use the centre pin and last washer to fix the truck to the truck support.

Stage complete.

arpurchase attached the following image(s):
PA290058.JPG
PA290061.JPG
PA290064.JPG
PA290068.JPG
PA290070.JPG
PA290072.JPG
PA290075.JPG
PA290077.JPG
PA290078.JPG
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

arpurchase
#3 Posted : 29 October 2016 20:33:14

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
Stage 31

Your parts :- Headlamp, lens, handle ,LED ,connector and terminals.

Insert the handle into the two holes on the smokebox door and fix it in place using some glue. Then take the headlamp and glue that in position above the smokebox door making sure it is correctly lined up.

Now take the LED and fed the wire through the headlight until the LED is inside the headlight.

Save any unused parts in a bag labeled with the stage number for future use.

Stage complete.
arpurchase attached the following image(s):
PA290083.JPG
PA290087.JPG
PA290091.JPG
PA290096.JPG
PA290101.JPG
PA290103.JPG
PA290101.JPG
PA290103.JPG
PA290107.JPG
PA290110.JPG
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

arpurchase
#4 Posted : 29 October 2016 20:44:38

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
Stage 32

Your parts:- Lock bar, handle, lever, lock, header, handrails and brackets.

On the inside of the smokebox door you will see two ridges use some glue to fix the lock bar between these ridges. Next take the handle and thread the bar onto it and then pass the assembly through the central hole of the smokebox door. Once you have it in position glue the lock onto the handle end. When the glue is dry test that the handle locks the smokebox door.

Next place three brackets onto handrail 'A' and the last two brackets onto handrail 'B'. Now fix handrail 'B' to the hinge side of the smokebox and rail 'A' to the other side with glue.

Save any unused parts in a bag labeled with the stage number for future use.

Stage complete.
arpurchase attached the following image(s):
PA290112.JPG
PA290114.JPG
PA290115.JPG
PA290118.JPG
PA290120.JPG
PA290126.JPG
PA290131.JPG
PA290133.JPG
PA290136.JPG
PA290138.JPG
PA290141.JPG
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

arpurchase
#5 Posted : 29 October 2016 20:48:29

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
Stage 33

Your parts:- Lower boiler half, joints and screws.

The boiler joints have a slight curve so make sure they are the right way round when fixing them to the lower boiler.

Next take a joint and line it up with the lower boiler, fix the joint in place using seven 2 x 3mm screws. Do the same for the other side.

Stage complete.
arpurchase attached the following image(s):
PA290145.JPG
PA290148.JPG
PA290151.JPG
PA290152.JPG
PA290154.JPG
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

arpurchase
#6 Posted : 29 October 2016 20:55:13

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
Stage 34

Your parts:- Boiler upper half, supply pipe, valve, brackets, nuts and screws.

You will need the parts left over from stage 32 for this stage.

Take the six handrail brackets and fix them to the boiler using the six nuts making sure the bracket holes line up so the rails will fit. Next fix the safety valve onto the boiler and fix the last four brackets to the smokebox again making sure the holes line up.

Remove the boiler joint from the rear of the smokebox and fit the header to it. Then take the two boiler halves and fix them together with 2 x 3mm screws. Then take the boiler joint and fix it to the boiler using 2 x 4mm screws. Next take the smokebox assembly and fix it to the boiler joint so you have a complete boiler assembly.

Place the water pipe in position on the boiler valve, making sure the pipe is correctly positioned next to the two screws.

Stage complete.
arpurchase attached the following image(s):
PA290156.JPG
PA290158.JPG
PA290159.JPG
PA290162.JPG
PA290166.JPG
PA290172.JPG
PA290175.JPG
PA290179.JPG
PA290183.JPG
PA290185.JPG
PA290187.JPG
PA290191.JPG
PA290211.JPG
PA290214.JPG
PA290217.JPG
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

arpurchase
#7 Posted : 29 October 2016 20:59:08

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
Stage 35

Your parts:- Tapered boiler, base ,cover ,valves and screws.

Take the boiler section and slide the base into the hole making sure it is in the correct position then add the cover and screw the two valves in place to fix the assembly in position. Once you have completed the assembly fix it to the main boiler assembly with four 2 x 3mm screws.

Stage complete.
arpurchase attached the following image(s):
PA290203.JPG
PA290206.JPG
PA290209.JPG
PA290216.JPG
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

arpurchase
#8 Posted : 29 October 2016 21:05:07

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 27/09/2011
Posts: 15,196
Points: 45,687
Location: Dudley
Stage 36

Your parts:- Firebox half, plugs, valve, brackets, joint, rod, nuts and screws.

Take the boiler assembly and fix the valve to it using a 2 x 3mm screw. Next take the firebox half and place the four plugs into the holes from the inside and fix in position with glue. Once the glue has dried add the two brackets to the firebox again making sure they are lined up with each other.

Now add the joint to the top of the firebox using two 2 x 3mm screws. Once the joint is in position fix the firebox side to the boiler assembly with two 2 x 3mm screws.

Stage complete.
arpurchase attached the following image(s):
PA290220.JPG
PA290223.JPG
PA290226.JPG
PA290227.JPG
PA290230.JPG
PA290233.JPG
PA290235.JPG
PA290239.JPG
PA290243.JPG
PA290247.JPG
Current builds:-C57,Zero, Lamborghini Countach, Caldercraft HMS Agamemnon,Robi,R2-D2, MFH Cobra .

Users browsing this topic
Guest (2)
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.238 seconds.
DeAgostini