Welcome Guest Search | Active Topics | Log In | Register

3 Pages <123>
Al's Routemaster bus Options
CaptnBirdseye
#21 Posted : 26 May 2020 21:31:37

Rank: Superelite

Active Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 10/05/2010
Posts: 2,608
Points: 7,519
Location: Lincolnshire
BigGrin Looking good Al ThumpUp
birdaj2
#22 Posted : 26 May 2020 21:42:57

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 31/05/2010
Posts: 5,679
Points: 17,011
Location: Wiltshire
Coming along very nicely Al.

I think wiring issues affect a number of kits. Been reading updates on the spitfire were some people are reporting a dead propellor motor but i think that is down to to poor wiring and not helped by that big “dolllop” of sealant they chucked onto the connection.

There was a posting on one of the facebook groups i look at were someone had changed the bus to a greenline colour scheme.

You have yourself a very nice model on the go there.

Tony
Happy Modelling

BUILDING: Hachette Spitfire Mk 1A, Constructo Mayflower
SUBSCRIPTION COMPLETE (Awaiting building): USS Constitution, Sovereign of the Seas, 1:200 Bismarck (Hachette)
COMPLETED: Porsche 911, E-Type Jaguar, Lam Countach
Spal
#23 Posted : 27 May 2020 14:54:42

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Cheers guysBigGrin Tony I think you could be right on the wiring issues affecting kits, personally once the kit is built and the electrics all working I remove the batteries from them and rarely ever try them again.

Al
Spal
#24 Posted : 27 May 2020 15:20:11

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Issues 41-45

Over these issues we fit the drivers headlight electrics and the front vents and cab windows. The radiator grill and wing from earlier in the build were attached to the cab assembly before the dashboard and floor was fitted. This assembly was then attached to the bus and the steering connected up carefully followed by the electrical cables being connected and routed in the frame channels.The speaker unit was then attached underneath the rear floor and the first of the seats built and fitted, lots more of them to come over future updatesBigGrin.

Al
Spal attached the following image(s):
41.JPG
41a.JPG
42.JPG
42a.JPG
42b.JPG
42c.JPG
43.JPG
44.JPG
45.JPG
45a.JPG
Spal
#25 Posted : 27 May 2020 15:41:19

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Issues 46-50

As promised we received lots more seats to assemble. Having assembled the last of the downstairs seating we turn the attention to the rear of the drivers cab panel before we start with the first panels of the interior trim. Finally the second interior panel set completes the sides and you end up with an other large sub assembly.

Al
Spal attached the following image(s):
47.JPG
47a.JPG
47b.JPG
48.JPG
48a.JPG
49.JPG
49a.JPG
50.JPG
50a.JPG
delboy271155
#26 Posted : 27 May 2020 16:25:17
Rank: Administration

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds

Joined: 09/11/2012
Posts: 7,954
Points: 23,051
Location: East midlands
Looks FAB.Cool Cool

The inside is just as I remember as a young child in East London near 60 years ago.LOL

I used to go to the front left hand seat (downstairs)and be the bus driver. I used the transmission tunnel to get up on the seat and much to my parents embarrassment would sit on who ever`s lap was there.(You could do that in those daysBlink ).

Waiting to see the future updates on this one.BigGrin


Regards
delboy271155
(Derek)
COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"






Gandale
#27 Posted : 27 May 2020 22:35:46

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Global Forum Support, Moderator, Official Builds, Administrators

Joined: 08/09/2012
Posts: 15,172
Points: 46,151
Location: Aberdeen
Looking good Al, making excellent progress....Cool Cool

Regards

Alan
Markwarren
#28 Posted : 27 May 2020 22:52:42

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Administrators, Global Forum Support, Moderator, Forum Support Team, Official Builds

Joined: 04/01/2016
Posts: 6,289
Points: 19,157
Location: Northamptonshire, England
Really looking good Al. That must be some size kit.Love

Mark
roymattblack
#29 Posted : 27 May 2020 22:56:06

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 4,215
Points: 12,790
Location: ipswich
I should think all those seats are a bit mind-boggling.
It's really looking good though. Reminds me of when I was a kid and lived in Dagenham. Those buses to Romford or the city.
Spal
#30 Posted : 28 May 2020 11:38:57

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Thanks for looking in guysBigGrin more soon.

Al
Spal
#31 Posted : 28 May 2020 12:06:33

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Issues 51-55

We now get a small break from the seat assembling and fittingBigGrin. First the route number box is assembled and mounted to the rear cab panel. Then the front interior panel has its handrails fitted before the windows are fitted and the panels joined. It is then attached to the lower deck assembly and before carrying on I couldn't resist a couple of pics of it in position on the chassis. We then turn our attention to the rear of the bus by fitting the used ticket bin,handrails and also the working push buttons for the bell. I have to say that all the printing on panels has been very nicely done and looks great. The wiring for the buttons is placed in position and the window and interior panels fitted. This assembly is then attached to the lower deck assembly.

Al
Spal attached the following image(s):
51.JPG
51a.JPG
52.JPG
52a.JPG
52b.JPG
52c.JPG
52d.JPG
54.JPG
54a.JPG
55.JPG
55a.JPG
55b.JPG
Spal
#32 Posted : 28 May 2020 12:53:41

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Issues 56-60

With these next issues we start by receiving the rear portion of the lower deck ceiling and fitting the handrails and light lenses. The remaining piece of ceiling is fitted and once again the light lenses installed and also the seat rail upright mounts. The stop request cord is then fitted and then the switch added and cable placed in position. The rear platform is shown together with the battery box and on/off switch and we now install the lower deck lighting. We then receive the circuit board and understairs luggage stowage panels. At this point I resisted the temptation of testing some of the electrics now fitted and opted to wait until later in the build once I had received all the electrical items. Reason being Hachette have you plugging and unplugging wires numerous times and sometimes fitting cable extensions which has had a lot of people having switch/battery box and circuit board issues and things generally not working as they should. Sometimes it pays to be a bit behind on a build as you can get the benefit of others experiences.

Al
Spal attached the following image(s):
56.JPG
56a.JPG
57.JPG
57a.JPG
57b.JPG
58.JPG
58a.JPG
59.JPG
59a.JPG
Spal
#33 Posted : 29 May 2020 11:49:52

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Issues 61-70

We kick these issues off by assembling more of the stairs to the upper deck and adding the understairs storage previously built. The inner rear panel has its handrails added and then the pole on the platform is secured at its base.Next the bonnet hinges are made up and once fitted to the bonnet, mounted to the lower deck compartment. This in turn is now secured onto the main chassis. The staircase assembly is then attached to the rear and the on/off switch fitted. The battery pack is taped in place and the roof also temporarily fitted. The next couple of issues contain the upper deck seating.

Al
Spal attached the following image(s):
61.JPG
61a.JPG
62.JPG
62a.JPG
63.JPG
63a.JPG
63b.JPG
64.JPG
64a.JPG
66.JPG
69.JPG
70.JPG
CaptnBirdseye
#34 Posted : 29 May 2020 18:31:22

Rank: Superelite

Active Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 10/05/2010
Posts: 2,608
Points: 7,519
Location: Lincolnshire
BigGrin Amazing build Al ThumpUp
I think you are doing Routemaster subscriptions a world of good, showing just what you get Love
If you can still get them, that is Laugh
roymattblack
#35 Posted : 30 May 2020 11:31:50

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 4,215
Points: 12,790
Location: ipswich
Another great update...

A small observation - NOT a criticism - the screws holding the metal plates on the stair risers look way too big to my eyes.
I think I would be inclined to fill the screw holes and repaint the panels, then just glue them in place...

Mind you, it's a VERY impressive build so far.BigGrin
Spal
#36 Posted : 31 May 2020 12:38:37

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Thanks GuysBigGrin

Gray you can still subscribe to it but I think only from issue 101Confused

Roy, you are rightly correct in noticing that they do look too big because they are BigGrin I know many others have used a combination of glue, smaller screws and rivets to overcome the problem of screw size. There is also the tendency for the plates to return to there slightly concave shape when glued so in the end i decided to leave as is being as not much of it will be seen if i put the conductor or a passenger in front of themBigGrin

Al
Spal
#37 Posted : 31 May 2020 13:30:11

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Issues 71-80

We complete the first three issues by fitting the seats to the three upper deck sections. The first piece of the upper deck floor framework is then fitted underneath the rear of the deck floor and once completed will mount to the lower deck section. Next we receive the rest of the lighting components and it was now I tested all of them, as can be seen in a few of the pics everything worked as it should. The second piece of the upper deck floor framework is then secured in place and we move on to assembling the front upper deck interior panel and the top of the staircase. The front panel is fitted to the upper deck floor and the destination blind is then assembled and secured to the panel.

Al
Spal attached the following image(s):
71.JPG
72.JPG
72a.JPG
73.JPG
73a.JPG
73b.JPG
74.JPG
74a.JPG
75.JPG
75a.JPG
75b.JPG
75c.JPG
76.JPG
76a.JPG
78.JPG
78a.JPG
79.JPG
79a.JPG
79b.JPG
80.JPG
80a.JPG
Steve1701
#38 Posted : 31 May 2020 13:59:14

Rank: Pro

Groups:

Joined: 24/08/2009
Posts: 48,051
Points: -13,308
very impressive al, how did you get on with the front roll blind.
Spal
#39 Posted : 31 May 2020 15:49:51

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Steve1701 wrote:
very impressive al, how did you get on with the front roll blind.


Thanks Steve,i didn't have any problems with it, just read through the instructions a couple of times and made very sure I kept my handling of it to a bare minimum, especially with all the grease on the sprockets.

Al
Spal
#40 Posted : 03 June 2020 12:52:22

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 19/06/2013
Posts: 4,588
Points: 13,553
Location: West Yorkshire
Issues 81-88

We start off by adding a couple more details to the drivers cab ceiling and the wiring for a couple more functional switches, before both panels are fitted to the underside of the top deck. The wires from these switches are connected into an extension loom and carefully positioned into cut outs in the underframe. Next we fit the inner trim panels on both sides and it was time to get a pic of the bus with the upper deck placed on top. The front windows are fitted into the outer panel which contains the destination boards and the rear inner panel is now fitted along with the upper deck poles. We also get the first parts of the upper deck ceiling and some posters.

Al
Spal attached the following image(s):
81.JPG
81a.JPG
82.JPG
82a.JPG
82b.JPG
84.JPG
84a.JPG
85.JPG
85a.JPG
85b.JPG
86.JPG
86a.JPG
87.JPG
87a.JPG
88.JPG
88a.JPG
Users browsing this topic
Guest (2)
3 Pages <123>
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.241 seconds.
DeAgostini