|
Rank: Super-Elite Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 4,504 Points: 13,672 Location: ipswich
|
STAGE 75
This pack contains the front bumper parts which are assembled very easily.
STAGE 76
In this stage the running boards are added to the main body and the two front wings (fenders) are also fitted. When fixing the front wings in place make sure the screws are sufficiently tightened to prevent the parts being loose and possibly 'wobbly'.
STAGE 77
This pack contains the windscreen wipers and the door support panels. When assembling the hinges and support parts make sure all screws are fully tightened. At this stage you can also highlight the air vents at the base of the windscreen using a fine black permanent marker pen.
STAGE 78
This pack contains the first parts of the dashboard which are not needed yet. However, The main body parts can now be fixed together, and the doors added. In all cases, ensure the fixing screws are fully tightened.
STAGE 79
The remaining dashboard parts are included here and all of the previous parts can now be assembled with this pack to make the dashboard, ready to fit to the car.
STAGE 80
This pack contains the lighting parts for the rear of the car. Fitting these parts is very straightforward. Make sure all of the wires are taped and fixed tightly.
STAGE 81
This pack contains the inner panel for the front luggage area but it is not needed yet. The front and rear bumpers are now fixed to the main body.
STAGE 82
The upper section of the fuel tank is provided here. This part can be enhanced by painting it with a satin or matt black finish.roymattblack attached the following image(s):
|
|
Guest
|
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.