|
Rank: Administration Groups: Administrator, Administrators, Forum Support Team, Global Forum Support, Global Forum Support Team, Moderator, Official Builds Joined: 24/08/2009 Posts: 1,927 Points: 5,803 Location: UK
|
Pack 11, Stages 51-55 (shorter and, wellllllll… sweetish…..)
Stage 51; Left side inner trimMount the left inner trim with 3CP screws. Place the roof cover mount into position and secure with 2CP screws. Stage 52 ;Right side inner trimMount the right side same as the left. Install the left front hinge as shown with a GP screw. Stage 53; Boot opening leverJoin the boot lever and the boot hinge with a DP screw. Put the other roof cover on as shown with a GP screw. Stage 54; Front bulkheadMount the lever hinge to the bulkhead with a KP screw from the underside. I decided to put the right hinge cover and the roof cover front hinge together, but I will tape it and the mounting screws to the Caravan top until the other front hinge is to be mounted in the next Pack. Stage 55; Right front seat baseBuild the right seat base as shown. Pack 11 is complete. admin attached the following image(s):
|
|
Guest
|
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.