Stage 37 - Contains a platform & rangefinder castings and hangar parts.
Mark the vertical lines on the panel at the points shown, the cut along the lines to make the hangar frames.
Select one of the hangar floor/ceiling panels and draw a straight line from one end to the other, so that it just misses the instep edge.
Then glue the groove hangar wall into place along the line, with the grooves facing inwards.
Add the hangar frames to the assembly, and sand level with the edges, then add the hangar ceiling.
Test fit the hangar wall along the open side of the hangar, aligning the left edge then apply glue and carefully fit/bend the panel into place.
Cut-off the overhang section and then sand the whole assembly smooth.
Check the platform and rangefinder casting for burrs, then glue the rangefinders onto the platform at the marked points as shown in the steps.
Prime the hangar section, platform and hangar block, then paint the platform grey, then highlight the scope ends of rangefinder's silver.
That's it for this week.
Future stages: Stage 38 - Contains ply hangar plates x7, metal hanger plates x2, 4x 25mm gun base and gun barrels.
Stage 39 - Contains hangar plates x10, hangar bars x5, wood strips, hangar floor, platform & rangefinder castings.
Stage 40 - Contains elevator parts and a 25mm twin gun base and gun barrels.
Tomick attached the following image(s):