|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,777 Points: 17,483 Location: ipswich
|
STAGE 117:
Reactor cables.
Pic 1: Press fit cable 117B in place where shown.
Pic 2: Press-fit the other cable 117B in place in the same way.
Pic 3: Fit cable 117A as shown. The smaller end fits in the cylinder.
Store safely for now.
roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,777 Points: 17,483 Location: ipswich
|
STAGE 118:
Reactor pipes and details.
Pic 1: Fix the cylinder 118B to the base with 1 x AP screw from underneath.
Pic 2: Fit the pipe 118C to the base as shown.
Pic 3: Fix from underneath with 2 x EP screws.
Pic 4: Fit the pipe 118D to the base as shown.
Pic 5: Fix from underneath with 2 x EP screws.
Pic 6: Fix part 118A to the base where shown using 1 x AP screw from underneath.
Store safely for now.
roymattblack attached the following image(s):
|
|
|
|
Guest
|
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.