|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,886 Points: 17,810 Location: ipswich
|
STAGE 147A:
Emergency time circuits.
Pic 1: Assemble the parts 147E and 147F as shown, fixing them with 2 x CP screws. Make two sets the same.
Pic 2: Fit the 2 x brackets 147G in the time circuit box where indicated.
Pic 3: Fix the assemblies from step 1 into the box as shown using 1 x AP screw from underneath in each.
Pic 4: Assemble parts 147H, 147I and 147M as shown.
Pic 5: Fix the assembly into the box where shown using 2 x QP screws.
roymattblack attached the following image(s):
|
|
|
 Rank: Super-Elite        Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered Joined: 04/06/2011 Posts: 5,886 Points: 17,810 Location: ipswich
|
STAGE 147B:
Pic 6: Assemble parts 147J, 147K, 147L, 147M and 147N in the order shown.
Pic 7: Fix the assembly into the box where shown using 2 x QP screws.
Pic 8: Fit the parts 147C and 147D together as indicated and fix from below with 1 x AP screw.
Pic 9: Fix the assembly into the box as shown using 1 x RP screw from underneath.
Pic 10: Press-fit parts 147B onto the base 147A. They will only fit one way.
Pic 11: Fix the assembly into the box with 2 x AP screws from underneath.
Store safely for now.
roymattblack attached the following image(s):
|
|
|
|
Guest
|
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.